BABAXPK's phased approach to building validated aerospace capability.

Note: Specific milestone dates and commercial availability timelines have not been announced. The roadmap below represents the intended development pathway and is subject to engineering progress, funding availability and regulatory requirements.
1

Concept & Research

Current

Technology definition, simulation-led analysis, concept validation and engineering feasibility studies for KAVALE-ISR and MARUTYA platforms.

2

Engineering Design

Planned

Detailed mechanical design, avionics architecture, payload interface specification, software architecture and bill-of-material development.

3

Prototype Development

Planned

Component procurement, airframe fabrication, electronics assembly, software integration and ground-level systems assembly.

4

Ground Testing

Planned

Structural testing, electronics validation, propulsion characterisation, software validation and pre-flight safety checks.

5

Flight Testing

Planned

Progressive flight envelope expansion, payload integration testing, autonomy validation and mission simulation.

6

Validation & Certification Pathway

Future

Formal validation, regulatory engagement with DGCA and applicable authorities, certification planning and documentation.

7

Commercial Deployment

Future

Customer engagement, supply agreements, manufacturing scale-up and lifecycle-support activation.